What should a configurator proof of concept prove?
Define a configurator proof of concept around a risky rule, saved revision and receiving-system output, with clear pass conditions.
Table of contents
A configurator proof of concept (POC) should answer a specific question before a larger implementation. It might test a difficult product rule, a 3D asset or a data handoff to an existing system. An attractive visual demonstration alone does not establish that the complete sales and production workflow will work.
What should a configurator proof of concept test?
Start with the biggest uncertainty and the decision the result will support. For example, check whether a CAD model is suitable for visualization, a rule behaves correctly at a dimension limit, or an ERP receives the agreed fields. Select only what is needed to answer that question.
Agree inputs, expected outputs, responsibilities and success criteria before work begins. Record what the POC excludes, so a working demonstration is not mistaken for evidence of an untested capability.
| Risk | Example test |
|---|---|
| Product rules | Test a valid configuration, a boundary value and a prohibited combination. |
| 3D model | Review agreed views, materials and performance on the specified devices. |
| Price or document | Compare the result with an approved calculation or required document. |
| Integration | Check agreed fields in the receiving system and how an error is reported. |
| Usability | Ask a salesperson or dealer to complete a task without a developer operating the interface. |
Choose a small but representative product slice
Use a limited part of the catalogue with real dependencies. For cabinetry, that could mean two permitted sizes, one out-of-range size and an accessory available only for one variant. If a handoff matters, agree which data must reach the destination system.
Keep the test results, configuration version, known limits and any manual steps. Ask whether the supplier demonstrated a working connection or only a sample file or an integration design.
Proof of concept versus production readiness
A successful POC can demonstrate the feasibility of a selected feature; it does not automatically make the full application ready for production. A complete implementation may require additional products, access controls, monitoring, price tests, accessibility review and error recovery.
Ask which POC elements can be reused and which may need rebuilding. Agree what remains to be tested, who supplies the data and how the findings affect scope and price.
Use the configurator implementation guide to plan acceptance of the product, commercial data and handoffs. When speaking with Configurix, bring the product and uncertainty you want to test; POC scope is agreed for the project.
Should a POC include every product family?
Usually the smallest set that exposes the important risk is sufficient. Establish separately how the findings apply to other families, especially when their geometry or rules differ.
Does a successful POC replace acceptance testing?
No. Its findings can improve the acceptance plan, but a production application has a broader scope. Test the agreed products, permissions, prices and integrations in the target workflow.
What if the test fails?
Record what failed, the test conditions and what remains to be clarified. A failure can still help assess risk before committing to a full implementation.
Book a private Configurix demo
Bring your product range, price list and a representative quote. We can define the configuration and sales workflow around your business.
Book a private Configurix demo →Related articles

What maintenance is needed when products change every week?
Specify configurator maintenance for frequent catalogue changes, distinguishing editable data, application changes, tests and emergency corrections.

Does available stock in a configurator mean it is reserved?
Distinguish stock visibility from reservation when connecting a configurator to inventory, including stale data, competing orders and acknowledgements.

Can you launch a configurator before your BOM is ready?
Plan a phased configurator launch when material data is incomplete, separating visual enquiries, quotations and approved factory outputs.

Does every configured size need a separate SKU?
Define model identity, continuous dimensions, component references and order records without creating a SKU for every possible configuration.
